Whole-house programme
Most whole-house problems are coordination problems: the kitchen arrives from one supplier, the wardrobes from another, and the two do not share a handle profile or a finish. Our whole-house programme puts kitchen, wardrobes, storage, laundry and outdoor units under one specification, one finish schedule and one installation contract.


Full 304 kitchens with stone worktops and appliance housing.

Walk-in and fitted wardrobes with glass and aluminium fronts.

Utility rooms, pantries and linen cabinets to the same finish.

316 marine-grade units for the terrace and pool area.
| Stage | Deliverable | Timeline |
|---|---|---|
| Design | Room-by-room layout, finish schedule, hardware selection | 2 – 3 weeks |
| Shop drawings | Numbered drawings per room with appliance cut-outs | 1 – 2 weeks |
| Sample & approve | Finish panel, handle sample and one full drawer assembly | 1 week |
| Production | Batch production with a retained golden sample per room | 45 – 90 days |
| Installation | Site delivery, installation and final handover pack | Per project |
Send the floor plan and the room list to start a whole-house programme.